In 2013, Aéroports de Paris conducted the study of air / road / rail interface.
This study
focused on the analysis of the accessibility of the new terminal at
Goussainville from Roissy-CDG airport by the completion of a road
link and secure area reserved for public roads. The modes of
transport and loading of pallets and containers and air logistics
processes at the station for loading and unloading the trains were
examined and analyzed.
Technical solutions will allow an optimal
management of the future Roissy Carex railport.